Project description
The Westerscheldetunnel is a bored tunnel in soft soil and accommodates a dual carriage motorway in two tubes. The bored tunnels have an inner diameter of 10.1 metres, approximately 6.5 km long and reaches to a maximum depth of 60 metres below sea-level. The total length of the crossing is about 7.0 km long. Transportation of hazardous goods is acceptable according to the category I tunnel classification. For safety reasons both tubes are connected with cross connections every 250 metres.
Scope of work
Reviewing the contractors detailed design of the bored tunnel, cross connections and access ramps; reviewing work method statements, quality plans and construction planning; monitoring of investigations for the design (fire-tests, freezing test for cross connections); advice with respect to local damage of lining during construction.
Client
NV Westerscheldetunnel
In co-operation with
Ministry of Transport and Public Works, Tunnel Engineering Department
Type of project
Country
The Netherlands
Location
Terneuzen
Project duration
1996 - 2002
Project phase
Completed
Construction cost
€ 613.000.000,= incl. M&E works (excl. VAT)
Consultancy fee
Appr. € 560.000,= (excl. VAT)