Söderström Tunnel

Project description

The tunnel in the Söderström is part of the Citybanan project and comprises a 340 m long immersed tunnel which is located between Riddarholmen and Södermalm. The immersed tunnel will be part of a 6 km long tunnel with two railway tracks and connects the rock tunnels at either side of Lake Ridderfärden. The Söderström tunnel consists of three prefabricated tunnel elements, two short cut and cover tunnels and a joint house. Unique for Europe and due to the limited water depth the immersed tunnel is constructed as a sandwich tunnel with concrete and a double steel shell. The tunnel is placed partly above the lake bed on 3 pile groups due to the soft soil on top of the bedrock.

Scope of work

  • Review of the immersion process plan and all related documents which are prepared by the Contractor.
  • Supervision / observations on behalf of the Client during the immersion operations.

 

Specification sheet 2 page(s) - 127 kB

Client

Trafikverket

In co-operation with

Not applicable

Type of project

Immersed Tunnels

Country

Sweden

Location

Stockholm

Project duration

Sept 2012 - Sept 2013

Project phase

Construction

Construction cost

appr. € 200 million

Consultancy fee

€ 120,000