Project description
The Shatin to Center Link is a new to build subway line between Shatin station on Kowloon Island and HK Central station on HongKong Island. Contract 1121 consists of the connecting Cut and Cover tunnels at Hung Hom Station and the Causeway Bay Typhoon Shelter, and in between an immersed tunnel with a length of 1.3 kilometres suitable for 2 track metro.
Scope of Work
TEC has been working together with MottMacDonald HK as a sub consultant for the Contractors’ JV consisting of Zublin (Germany), Samsung (South Korea), Strukton (The Netherlands) and Hsin Chong (HongKong). TEC was responsible for the design of the immersed tunnel; the baseline design and several alternatives resulting in an Innovative Design.
Client
Harbour Crossing JV
In co-operation with
Mott MacDonald HongKong
Type of project
Country
HongKong SAR
Location
HongKong
Project duration
2014
Project phase
Tender
Construction cost
Not applicable
Consultancy fee
€ 404.000,- (excl. VAT)