Project description
One of the most challenging international metro projects of the last decade is the North/South Metro Line in Amsterdam. To relieve the existing public transport system (bus, tram, metro and ferry lines) in and around Amsterdam, the existing metro system will be complemented by an additional 5th line, the North-South line. The new line is expected to provide transport for approximately 200,000 people a day. The 1st part of the line extends from the A10 ring road in Amsterdam North to the A10 ring road in Amsterdam South and has a length of 9.5-km.
Scope of Work
As the Lead Consultant for the Client the TEC partners were responsible for the integral design. During the initial stages, the Reference Design was developed, followed by the pre-design, final and detailed designs, drawings and technical specifications, tender documents, consultancy regarding the contracting strategy, contract administration, construction supervision, as well as the preparation of procedures and guidelines for project monitoring, assistance with the public consultation and permit process, risk management, construction safety and environmental issues.
Client
Municipality of Amsterdam
In co-operation with
Not applicable
Type of project
Country
The Netherlands
Location
Amsterdam
Project duration
1994- 2017
Project phase
All project phases
Construction cost
€ 3.000.000.000,- (excl. VAT)
Consultancy fee
More than € 200.000.000,- (excl. VAT)