Noordtunnel installations

Project description

The mechanical and electrical installations for the Noordtunnel comprise:

  • Energy supply
  • Tunnel lighting
  • Drainage and tunnel ventilation
  • Traffic installations
  • Fire fighting provisions
  • Communication systems
  • Maintenance building installations
  • Plant control and control systems

Scope of work

To prepare a conceptual design, final design and tender documents. Control of detailed engineering and construction of the installations. Responsible for construction supervision management on site.

Specification sheet 2 page(s) - 248 kB

Client

Exploitation company Tunnel under "de Noord"

In co-operation with

Ministry of Transport and Public Works, Tunnel Engineering Department; Technical Management

Type of project

Technical Systems

Country

The Netherlands

Location

Rotterdam

Project duration

1988 - 1993

Project phase

Completed

Construction cost

€ 13.613.000,= (excl. VAT)

Consultancy fee

Conceptual design € 182.000,=; Tender design € 159.000,= Construction and testing phase € 567.000,= (excl. VAT)