Project description
The mechanical and electrical installations for the Noordtunnel comprise:
- Energy supply
- Tunnel lighting
- Drainage and tunnel ventilation
- Traffic installations
- Fire fighting provisions
- Communication systems
- Maintenance building installations
- Plant control and control systems
Scope of work
To prepare a conceptual design, final design and tender documents. Control of detailed engineering and construction of the installations. Responsible for construction supervision management on site.
Specification sheet
2 page(s) - 248 kB
Client
Exploitation company Tunnel under "de Noord"
In co-operation with
Ministry of Transport and Public Works, Tunnel Engineering Department; Technical Management
Type of project
Country
The Netherlands
Location
Rotterdam
Project duration
1988 - 1993
Project phase
Completed
Construction cost
€ 13.613.000,= (excl. VAT)
Consultancy fee
Conceptual design € 182.000,=; Tender design € 159.000,= Construction and testing phase € 567.000,= (excl. VAT)