Project description
The ChangHong tunnel in Ningbo is crossing the river ChangHong. The crossing comprises an immersed tunnel section of 400 m in length of 4 elements each 100 m long. The tunnel width is 22,80 and the overall height is 8,45 m.
Scope of work
TEC in association with the Municipality of Rotterdam provided design and supervision services to the Contractor STEC from Shanghai.
- Design support
- Assistance during construction
Specification sheet
1 page(s) - 108 kB
Client
STEC Shanghai Tunnel Engineering Company
In co-operation with
Design department Municipality of Rotterdam
Type of project
Country
China
Location
Ningbo
Project duration
1999 – 2002