Ningbo

Project description

The ChangHong tunnel in Ningbo is crossing the river ChangHong. The crossing comprises an immersed tunnel section of 400 m in length of 4 elements each 100 m long. The tunnel width is 22,80 and the overall height is 8,45 m.

Scope of work

TEC in association with the Municipality of Rotterdam provided design and supervision services to the Contractor STEC from Shanghai.

  • Design support
  • Assistance during construction
Specification sheet 1 page(s) - 108 kB

Client

STEC Shanghai Tunnel Engineering Company

In co-operation with

Design department Municipality of Rotterdam

Type of project

Immersed Tunnels

Country

China

Location

Ningbo

Project duration

1999 – 2002

Project phase

Construction cost

Consultancy fee