project description
TEC was involved in the extension of the Stockholm subway project, TUB A. The TEC design team worked in close collaboration with WSP who was the main consultant for this project. TEC was involved in the design of the Northern ticket hall of station Arenastaden for the System Handling Phase. The station will connect Stockholm’s existing underground network to new developments in the Solna area, including the stadium (Arena) and Mall of Scandinavia.
Scope of Work
TEC contribution to the design was:
- Structural and geotechnical design by the use of PLAXIS
- Design drawings in REVIT
Specification sheet
2 page(s) - 196 kB
Client
WSP
In co-operation with
Not applicable
Type of project
Country
Sweden
Location
Stockholm
Project duration
2014-2015
Project phase
Preliminary design
Construction cost
N.A.
Consultancy fee
€ 210.000,-