Metro Arenastaden

project description

TEC was involved in the extension of the Stockholm subway project, TUB A. The TEC design team worked in close collaboration with WSP who was the main consultant for this project. TEC was involved in the design of the Northern ticket hall of station Arenastaden for the System Handling Phase. The station will connect Stockholm’s existing underground network to new developments in the Solna area, including the stadium (Arena) and Mall of Scandinavia.

Scope of Work

TEC contribution to the design was:

  • Structural and geotechnical design by the use of PLAXIS
  • Design drawings in REVIT
Specification sheet 2 page(s) - 196 kB

Client

WSP

In co-operation with

Not applicable

Type of project

Cut & Cover Tunnels

Country

Sweden

Location

Stockholm

Project duration

2014-2015

Project phase

Preliminary design

Construction cost

N.A.

Consultancy fee

€ 210.000,-