Project description

The Marieholm Tunnel in Gothenburg is a road tunnel with three lanes per direction and a central gallery. The tunnel consists of an immersed tunnel section with cut & cover tunnel and open ramp sections at both ends. The immersed tunnel section crosses the Göta Alv river, measures 306m in length and is made up of 3 tunnel elements of equal length.

The tunnel elements will be fabricated in a construction dock at the Marieholm-side of the crossing, within the alignment of the tunnel. The construction dock has room for a single tunnel element which requires the dock to be used 3 times for the IMT after which the cut & cover tunnel can be realised at that side of the crossing. The tunnel elements will be segmented and will be placed in a dredged trench on a sandflow foundation.

Scope of work

Permanent civil works for the immersed tunnel section of the project:

  • Preliminary Design
  • Final Design
  • Detailed Design
Specification sheet 2 page(s) - 223 kB

Client

JV Marieholmstunneln (Züblin - Boskalis)

In co-operation with

Arup, Centerlöf & Holmberg

Type of project

Immersed Tunnels

Country

Sweden

Location

Gothenburg

Project duration

2014-2016

Project phase

Detailed design

Construction cost

SEK 2,0 billion (excl. VAT)

Consultancy fee

EUR 1,150,000 (excl. VAT)