HSL-Zuid detailed design

Project description

The high speed railway line from Schiphol Airport to Antwerp. For this railway line a number of large works have to be constructed. Two of them are the crossings of the river Oude Maas and the river Dordtsche Kil which are done by immersed tunnels. The enclosed parts of the tunnels are 1500 m. The sections below the rivers will be constructed with the immersed tunnel technique, with seven elements of 150 m each. The cross section comprises two tubes with one track each. The tunnel is suited for trains with a cruise speed of 300 km/h.

Scope of work

Civil and structural:

  • Detailed design
  • Structural calculations and drawings
  • Geotechnical and geo-hydrological advisory
  • Cost estimates and construction planning
  • Supervision on the execution of the works
Specification sheet 2 page(s) - 508 kB

Client

Contractors joint venture HSL-Drechtse Steden

In co-operation with

Not applicable

Type of project

Immersed Tunnels

Country

The Netherlands

Location

Barendrecht and Dordrecht

Project duration

2000-2003

Project phase

Completed

Construction cost

EUR 295.000.000,= excl. M&E works (excl. VAT)

Consultancy fee

Detailed design and consultancy EUR 3.500.000,=