Project description
The Genoa Harbour Crossing is a project concerning an approximately 4 km long road connection through the port of Genoa with 4 junctions to the city. The harbour crossing is design as a bored or immersed tunnel and is suitable for 2 times 3 lanes road traffic.
Scope of work
Study and preliminary design of the harbour crossing in Genoa, Italy
In the study several solutions are considered for a tunnel (immersed and bored), including ramps, viaducts and junctions to the city road network. In the study the different alignments and designs are compared. In co-operation with the Client, a decision was made for the solutions to be taken into account in the preliminary design. During the preliminary design both a bored and immersed tunnel are considered. The following aspects are designed and taken into account:
- Alignment
- Construction of tunnel, shafts, ramps and viaducts, incl. M&E works
- Constructions works
- Junctions to city roads
- Costs estimate
- Environmental study
Client
Tunnel di Genova
In co-operation with
High Point Rendel, Technital, d'Appolonia
Type of project
Country
Italy
Location
Genoa
Project duration
2003 - 2006
Project phase
Preliminary design
Construction cost
appr. € 300 mln (excl. VAT)
Consultancy fee
TEC part € 370.000,= (excl. VAT)