Project description
The centre of Nijverdal is one of the last city centres in the Netherlands that is split in two by a national highway. This obviously has a detrimental effect on the liveability, traffic flow and traffic safety in the Nijverdal centre. To improve this situation, the city council, together with the Netherlands Ministry of Transport and Public Works have initiated the “Combiplan” project that aims at abandoning the through traffic from crossing the city centre. The Nijverdal Combiplan project includes a 400-m long tunnel section, with an open-tunnel section and approach ramps on both ends. The tunnel will accommodate 2 x 2 traffic lanes, each of which will be in a separate tube. The tunnel will also accommodate the double track railway line.
scope of work
The complete project that also includes all associated works on the surface is realised under Design & Built. The contractor for the project invited Royal Haskoning to provide the structural design for the road and railway tunnel. Royal Haskoning has undertaken this assignment using System Engineering methodology.
Client
Royal Haskoning
In co-operation with
Not applicable
Type of project
Country
The Netherlands
Location
Nijverdal
Project duration
2008 - 2012
Project phase
Design & execution
Construction cost
EUR 60.000.000 (excl. VAT)
Consultancy fee
EUR 1.200.000 (excl. VAT)