Project description
The extension of the A15 motorway to the so-called Maasvlakte crosses the Calandcanal. For this crossing a tunnel will be build with a total length of 1500 m. The enclosed part of the tunnel is 1100 m. The section below the canal will be constructed with the immersed tunnel technique, with six elements of 115 m. The cross section comprises 2 motorway tubes with 3 lanes each. The tunnel is suited for the transport of dangerous goods (category I).
Scope of work
- Functional and design requirements
- Preliminary design and final design, including calculations, drawings and schemes
- Risk analyses
- Tender documents
- Cost estimates
- Review of contractors detailed design
- Monitoring and construction supervision
Specification sheet
2 page(s) - 232 kB
Client
Ministry of Transport and Public Works, Tunnel Engineering Department
In co-operation with
Not applicable
Type of project
Country
The Netherlands
Location
Rotterdam
Project duration
1995 - 1998 Design and tender phase; 1998 - 2004 Construction
Project phase
Completed
Construction cost
€ 25.000.000,= Installations only (excl. VAT)
Consultancy fee
€ 3.000.000,= (excl. VAT)