Botlektunnel renovation

Project description

The mechanical and electrical installations renovation for the Botlektunnel comprise:

  • Energy power systems
  • Distribution systems
  • UPS-system
  • Speed Discrimination System
  • Plant control and control systems

Scope of work

To prepare a conceptual design, final design and tender documents.
Control of detailed engineering and construction of the installations.
Responsible for construction supervision management on site.

Specification sheet 1 page(s) - 129 kB

Client

Ministry of Transport and Public Works

In co-operation with

Not applicable

Type of project

Technical Systems

Country

The Netherlands

Location

Rotterdam

Project duration

1999-2004

Project phase

Completed

Construction cost

€ 1.800.000,= (excl. VAT)

Consultancy fee

Design and tender documents € 105.000,=; Construction and testing phase € 290.000,= (excl. VAT)