Project description
The mechanical and electrical installations renovation for the Botlektunnel comprise:
- Energy power systems
- Distribution systems
- UPS-system
- Speed Discrimination System
- Plant control and control systems
Scope of work
To prepare a conceptual design, final design and tender documents.
Control of detailed engineering and construction of the installations.
Responsible for construction supervision management on site.
Specification sheet
1 page(s) - 129 kB
Client
Ministry of Transport and Public Works
In co-operation with
Not applicable
Type of project
Country
The Netherlands
Location
Rotterdam
Project duration
1999-2004
Project phase
Completed
Construction cost
€ 1.800.000,= (excl. VAT)
Consultancy fee