Blankenburg Link Rotterdam

Project Description

The Blankenburg Link will connect motorway A20 near Vlaardingen (North bank) to the motorway A15 near Rozenburg (South bank) by means of the new motorway A24, accommodating 2×3 lanes. The new link contributes to a robust road motorway network in the Rotterdam Area and improves the connection between the Rotterdam Port and the economic heart of the Netherlands, the Randstad.

Scope of Work

TEC is the main consultant to the BAAK DBFM Consortium for the tunnel related design services (civil and MEP) for:

  • Holland tunnel
  • Maas Delta tunnel

The services were provided for the (winning) tender design, preliminary design, final design, detailed design and site engineering. For the project a full integrated 3D BIM model was developed that was used for an integrated tender design and further detailed up to the preparation of construction documents (LOD350) for both civil and MEP works. In addition, TEC held key positions in integrated design management, stakeholder management and technical committees.

Specification sheet 2 page(s) - 390 kb

Client

BAAK EPCM v.o.f., consisting of Deme Group (B) and Ballast Nedam (NL)

In co-operation with

Not applicable

Type of project

Immersed Tunnels

Country

The Netherlands

Location

Vlaardingen (Rotterdam)

Project duration

2016-2024

Project phase

Tender design - detailed design

Construction cost

Approx. €700 million (DBFM)

Consultancy fee

Approx. € 21 million