Project description
The project concerns the crossing of the south taxiway to the 5th runway at Schiphol with the Hoofdvaart canal in the Haarlemmermeer as well as the roads, which run parallel to it. Due to this new runway, the road was modified from ground level to below ground level, and is constructed in a concrete U-shaped structure. The flyover for the taxi-way and the adjacent parallel service road are designed as a pre-stressed concrete structure, cast in-situ.
Scope of Work
- Preliminary design and final design
- Detailed design
- Construction supervision
Specification sheet
1 page(s) - 186 kB
Client
Amsterdam Airport Schiphol, Schiphol Project Consult
In co-operation with
Zwarts & Jansma Architects
Type of project
Country
the Netherlands
Location
Schiphol
Project duration
1997-2002
Project phase
Completed
Construction cost
Appr. € 14.000.000,- (excl. VAT)
Consultancy fee
€ 650.000,- (excl. VAT)