VCRD

Project description

The renovation for the VCRD, the Drechttunnel, the Noordtunnel, the Bridge over the Noord, the Wantij bridge and the Papendrechtse bridge comprise:
Plant control and control systems.

Scope of work

To prepare a conceptual design, final design and tender documents.
Control of detailed engineering and construction of the installations.
Responsible for construction supervision management on site.

Specification sheet 1 page(s) - 290 kB

Client

Ministry of Transport and Public Works

In co-operation with

Type of project

Technical Systems

Country

The Netherlands

Location

Rotterdam

Project duration

2001 - 2004

Project phase

Completed

Construction cost

€ 1.772.000,= (excl. VAT)

Consultancy fee

Design and tender documents € 150.000,=; Construction and testing phase € 400.000,= (excl. VAT)