Shatin to Center Link

Project description

The Shatin to Center Link is a new to build subway line between Shatin station on Kowloon Island and HK Central station on HongKong Island. Contract 1121 consists of the connecting Cut and Cover tunnels at Hung Hom Station and the Causeway Bay Typhoon Shelter, and in between an immersed tunnel with a length of 1.3 kilometres suitable for 2 track metro.

Scope of Work

TEC has been working together with MottMacDonald HK as a sub consultant for the Contractors’ JV consisting of Zublin (Germany), Samsung (South Korea), Strukton (The Netherlands) and Hsin Chong (HongKong). TEC was responsible for the design of the immersed tunnel; the baseline design and several alternatives resulting in an Innovative Design.

Specification sheet 2 page(s) - 423 kB


Harbour Crossing JV

In co-operation with

Mott MacDonald HongKong

Type of project

Immersed Tunnels


HongKong SAR



Project duration


Project phase


Construction cost

Not applicable

Consultancy fee

€ 404.000,- (excl. VAT)